Translations:GeoLink Configuration/14/en

From Spirit System Manual
Revision as of 18:12, 28 July 2018 by FuzzyBot (Talk | contribs) (Importing a new version from external source)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  1. On the following power up of the model you will immediately notice 3 series of rapid LED flashing on the GeoLink.
  2. The Status LED will be indicating progress of the calibration then. Start moving with the model in all possible directions and angles to mimic a sphere. Any LED flash will indicate that a new calibration data were acquired.
  3. Rotate with the module as long until you will see periodic LED flashing. At this point the calibration is finished. After following re-power the module is ready for operation.