Difference between revisions of "Translations:GeoLink Mounting/45/es"

From Spirit System Manual
Jump to: navigation, search
(Created page with "No cubra el conector GEOLINK con cinta, pegamento o pintura.La apertura sobre el conector se utiliza para determinar la presion ambiental y la altitud.")
 
 
Line 1: Line 1:
No cubra el conector GEOLINK con cinta, pegamento o pintura.La apertura sobre el conector se utiliza para determinar la presion ambiental y la altitud.
+
No cubra el conector GeoLink con cinta, pegamento o pintura. La apertura sobre el conector se utiliza para determinar la presion ambiental y la altitud.

Latest revision as of 21:44, 29 January 2019

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (GeoLink Mounting)
Do not cover GeoLink connector with any tape, glue or paint. Opening above the connector is used to determine ambient pressure and altitude.
TranslationNo cubra el conector GeoLink con cinta, pegamento o pintura. La apertura sobre el conector se utiliza para determinar la presion ambiental y la altitud.

No cubra el conector GeoLink con cinta, pegamento o pintura. La apertura sobre el conector se utiliza para determinar la presion ambiental y la altitud.